As the leading manufacturer of professional electrical products engineered to facilitate portable generator power integration, we have always been acutely sensitive to market demand based on weather events. Hurricane Irene and the October 29th snow storm in the Northeast were two events whose near simultaneous occurrence could not possibly have been predicted. These two events, combined with the November 11, 2011 wind storms in California, left over 6 million homes without power, some for weeks.
As of today, our lead time is about two days for new orders for transfer switches, transfer panels and power inlet boxes. Expedited orders can be shipped same day if placed before noon.
Thank you for your patience